SuperLink China Direct Airport Direct HEx HEFC English繁體中文简体中文
SuperLink China Direct
Home > SuperLink China Direct > Cross Boundary Truck Services > Customs Bonded Consolidated Truck Service > Humen Port, Dongguan (DGM)
Humen Port, Dongguan (DGM) < Back
Humen Port, Dongguan (DGM)
Travel time between Hong Kong and Dongguan:
By road: approx 2 hours
By train: approx 1 hour 10 minutes
By ferry: approx 2 hours
Download Northbound Truck Schedules
Download Southbound Truck Schedules
  • Lies at the central southern of Guangdong province and to the north-east of the PRD region. It is around 140 km from Hong Kong.
  • Bridge between Hong Kong and Guangzhou, and between the east and west banks of the PRD region.
  • It has good infrastructure with highways, railways and waterways linking to different destinations.
  • An international manufacturing and processing trade base. The leading manufacturing industries in Dongguan are telecommunications equipment, computers, electronics, electric equipment and machinery, textiles, garments and chemicals.

Humen Port, Dongguan (DGM)
Guangzhou Airport (CAN)
Guangzhou Free Trade Zone (ZMY)
Shenzhen Airport (SZX)
Fuzhou Airport (FOC)
Xiamen Airport (XMN)
Other Destinations

Download DGM Leaflet

To read the brochure or leaflet, we suggest use Adobe Acrobat Reader. Download Adobe Reader